Epoxy Flooring · Tweed Heads

    Commercial Epoxy Flooring for Warehouses, Workshops and Kitchens

    Line marking, chemical resistance, coved edges and forklift traffic — what commercial epoxy needs that a garage floor doesn't.

    Match the system to the load

    A retail showroom and a forklift aisle are different problems. Light commercial spaces run a roller-applied epoxy at 300–500 microns; heavy traffic and impact zones need a high-build or trowel-applied screed measured in millimetres.

    Compliance details that matter

    Commercial floors carry obligations a garage does not.

    • Slip resistance rated for the space and documented
    • Coved skirtings and sealed junctions in food-handling areas
    • Chemical resistance for wash-down and cleaning regimes
    • Line marking, hatching and bay layout applied before the final coat

    Working around your trading hours

    We stage commercial floors in sections, work nights and weekends where needed, and use fast-cure polyaspartic systems that return a space to service in 24 hours instead of a week.

    Whole-of-life cost

    A properly specified commercial floor costs more per square metre than a thin coat but avoids annual patching, shutdown time and premature recoating. Over a ten-year horizon it is almost always the cheaper option.

    Get a free quote from a licensed epoxy flooring in Gold Coast

    Munn & Co. Finishes is fully licensed in NSW (461243C) and QLD (15536255), insured and based locally — so we can usually quote Gold Coast jobs within 24–48 hours. Call 0444 528 452 or request a free written quote online and we'll walk the job with you, photograph problem areas and send a clear, fixed-price scope before any work begins.

    Commercial epoxy flooring gold coast — frequently asked questions

    How much does epoxy flooring cost in Tweed Heads?
    Epoxy floors in Tweed Heads usually run $60–$120 per square metre installed, depending on the existing slab condition, grinding and moisture testing required, and whether you choose flake, metallic or a plain solid colour.
    How long before I can drive on a new epoxy floor?
    Foot traffic is generally fine after 24 hours and vehicle traffic after 5–7 days. Full chemical cure takes about a week in Tweed Heads's humidity, so we schedule the job around when you need the space back.
    Does the concrete have to be ground first?
    Yes — diamond grinding the slab is what gives epoxy something to key into. Roll-on kits applied over sealed or dusty concrete are the most common reason coatings peel.
    Are you licensed and insured to work in Tweed Heads?
    Yes. Munn & Co. Finishes holds an NSW painting licence and a QLD QBCC licence, and we carry full public liability insurance. Licence and insurance details are supplied in writing with every Tweed Heads quote.
    How do I get a quote for commercial epoxy flooring gold coast in Tweed Heads?
    Call 0400 000 000 or send the online quote form. We book a free on-site walkthrough in Tweed Heads, then send a fixed written quote — surfaces, products, coats and timeline — usually within 24–48 hours.